The outputs generated by this model are for indicative purposes only and should not be considered official predictions or representations. Actual results can differ materially. Outputs assume 7% year-over-year utilization growth, a flat selling price and electricity cost, approximately 13% energy loss from the utility/grid to the vehicle battery, and a $0.10/kWh Tesla services fee escalating at 3% a year. Installation cost varies with utility capacity, trenching and civil scope and is refined during a site assessment. Excludes taxes, rent for the parking spaces, and any incentives your site may qualify for. Totals exclude potential utility fees — transformer, service upgrade and interconnection charges vary by utility and site and are not included in the figures above. Bullet EV does not guarantee revenue, utilization, cost or payback. A site assessment produces a more detailed, property-specific model — still an estimate, not a promise.
Want a deeper look at the numbers?
Request a site assessment and we will build a more in-depth, year-by-year breakdown for your address, taking in utility capacity, the likely construction scope and any incentives your site may qualify for. It remains an estimate — we do not guarantee results.
Request received
We have your details and will review them. If you would like to talk it through sooner, pick a time that suits you.
We have your details and will review them. Someone from the team will be in touch within one business day.
Questions in the meantime? Call (512) 942-2448.
Want this modelled against your actual site?
A site assessment gives you a more detailed breakdown built on your property rather than an average. Still an estimate, but a far better informed one.