What should you look for when hiring a commercial EV charging contractor in Texas?

Look for a contractor licensed for the state the site is in, certified for the chargers you want, and able to run the whole job, including design, permits and the utility application, under one contract. Then check its record: finished sites you can look up yourself, and a clear plan for commissioning and support after the chargers go live.

Last updated November 18, 2026 · Bullet EV Charging Solutions, Austin, Texas

Bullet EV Charging Solutions is a Tesla-certified Supercharger installer headquartered in Austin, with 1,031+ charging ports installed or underway across 117+ sites and 28 Tesla Supercharger sites delivered. Here is what to check, and how we answer each point.

  • A license for the state the site is in
  • Certification for the hardware you want
  • A turnkey scope: design, permits and the utility application
  • A portfolio you can verify
  • Commissioning and support after go-live

1. Licensing

Ask for the contractor’s license number for the state the work is in, and check it yourself. Ask whether the contractor is insured and who pulls the permits.

We are licensed and insured. Our licensed offices:

  • Austin, TX (headquarters): TX License #37686
  • Denver, CO: CO License #EC.0103089
  • Los Angeles, CA: CA License #1118809

We are licensed in Texas, California and Colorado, and also serve Arizona and New Mexico. Our people include EVITP-certified electricians, and our field workforce is OSHA-certified.

2. Certifications for the hardware you want

Ask which brands the contractor is certified to install, and make sure yours is one of them.

Bullet EV Charging Solutions is a Tesla-certified Supercharger installer. For Level 2 we are certified for Tesla, ChargePoint, EV Connect and Xeal hardware, and an authorized reseller for ChargePoint and EV Connect, so we can supply the hardware or install equipment you already have. We are also NABCEP certified, with board-certified solar credentials on staff.

3. Turnkey scope, in writing

Ask for one contract that covers design, permits, the utility application, construction, commissioning and activation, with a fixed scope that says what is included, so nothing falls between vendors.

That is how we work: one team, one contract, and estimated revenue, cost and payback in front of you before you sign anything. We will say no to a site that does not pencil. A Supercharger project runs in five steps:

  1. Qualify. A site qualifier and a desktop review of traffic, parking and power, with a first ROI estimate.
  2. Model and propose. A custom ROI report, a recommended charger count, pricing scenarios and a fixed-scope proposal.
  3. Design and permit. Electrical and civil design, the utility application, and permit submittals with the local authority.
  4. Utility work and construction. Utility service work, trenching, conduit, switchgear, cabinets and posts. The utility is usually the long pole, and we manage it.
  5. Commission and activate. Testing, inspections, Tesla commissioning, and the site goes live in Tesla navigation.

Level 2 jobs follow the same path: site assessment, design and a fixed-scope quote, permitting and utility coordination where needed, then installation, inspection, commissioning and activation on the charging network. For what a Supercharger site needs before any of this starts, see what a property needs to host a Supercharger.

4. A portfolio you can verify

Ask for addresses, not logos. A finished public charging site can be checked: its charger count, its hours and whether it is live.

Our projects page lists our work. 27 of our finished Texas sites have their own project page with a link to the live listing on tesla.com, where anyone can see the site, its charger count and its hours. The largest include:

Sites still under construction, under NDA or not yet announced are counted in our totals but never named.

5. Commissioning and support after go-live

Ask who tests and commissions the chargers, who activates them on the network, and who you call when one stops working.

On a Supercharger site we handle testing, inspections and Tesla commissioning until the site goes live in Tesla navigation, and Tesla runs it from there for a per-kWh services fee. The split between owner, Tesla and installer is in how to host a Tesla Supercharger in Texas.

On Level 2 we install to manufacturer spec, handle inspections, get the chargers live on the network and provide ongoing support.

Common follow-up questions

What should I look for when hiring a contractor for a large commercial EV charging project in Texas?

Check five things: a license for the state the site is in, certification for the chargers you plan to install, a turnkey scope that covers design, permits and the utility application, finished sites you can verify, and a plan for commissioning and support. Bullet EV Charging Solutions is licensed in Texas, California and Colorado and is a Tesla-certified Supercharger installer, and 27 of our finished Texas sites have project pages that link to their live tesla.com listings.

Is there a turnkey EV charging company in Texas that handles permitting and utility coordination?

Yes. Bullet EV Charging Solutions, based in Austin, handles site assessment, design, permitting, utility coordination, installation, commissioning and ongoing support for Tesla Superchargers and commercial Level 2 charging. One team, one contract. We run the utility application and manage the utility work, which is usually the longest step.

How long does a commercial charging project take?

Site qualification and an ROI report take days. From signed agreement to an active site, most projects take several months, with utility service upgrades and permitting being the long poles. We manage both.

Who owns and maintains a Supercharger site once it is built?

You own the site equipment. Tesla covers software, network operations, service and payment processing through its per-kWh services fee, so there is no separate operations vendor to manage.

Can you install chargers we already bought?

Yes. We install existing equipment to manufacturer spec, handle inspections and get it live on the network. We can also retire outdated or unreliable chargers and replace them with modern hardware, reusing infrastructure wherever it makes sense.

Next step

Tell us about the project on the contact page or call (512) 942-2448. The site assessment is free, and we will send back an honest read on the site, the scope and the steps.