What EV charging should an apartment community install?
Most apartment and multifamily properties should install networked Level 2 chargers: residents park overnight, so a 7 to 19 kW charger fills the car by morning at a fraction of the cost of fast charging. Load management lets the property add chargers without a new electrical service in many cases, and the charging network handles billing.
Last updated November 15, 2026 · Bullet EV Charging Solutions, Austin, Texas
Bullet EV Charging Solutions has installed Level 2 charging at 20 apartment and multifamily properties in 11 Texas cities, 164 chargers in all, with 2 more under construction. This page covers what we walk a property owner or manager through on a free site assessment.
Why apartment communities add EV charging
For a resident with an EV, charging at home is the whole point of owning one. A renter usually cannot install a charger in an assigned space, so a property that offers charging gives EV drivers a reason to sign and to renew, and one that does not is easy to skip when they compare listings.
Charging also keeps residents from running extension cords from balconies and patios, and it gives the property control over where cars charge and who pays for the power.
Level 2 or fast charging?
The answer depends on how long cars stay parked.
- Level 2 (AC) delivers 7 to 19 kW per port and takes hours to charge a car. It suits overnight parking, costs less in hardware and electrical work, and scales with load management. This is the right fit for nearly every apartment community.
- A Tesla Supercharger delivers 50 to 500 kW per post and gets a car to 80% in 20 minutes to an hour. It needs a dedicated block of parking, much more power and a larger investment, and it earns from drivers passing through. It only fits a property with road frontage on a busy corridor. See what a property needs to host a Supercharger.
The commercial Level 2 page compares the two side by side.
How many chargers to start with
The 20 finished multifamily sites we have built in Texas range from 2 to 44 chargers, and the typical one has 6. The right number depends on how many residents drive EVs now, how quickly that is growing, and whether the chargers are shared or assigned. A common approach is to install a first bank of chargers in a shared area and run conduit and capacity for more, so adding chargers later is a smaller job.
Shared or assigned spaces
- Shared chargers in a common area serve the most residents per charger. Residents move their car when it is full, and the network can add idle fees to keep spaces turning over.
- Chargers at assigned or garage spaces suit communities where residents pay for a reserved spot. They cost more per resident served, because each charger serves one household.
Many properties use both: a shared bank for everyone, plus assigned chargers offered as a paid upgrade.
Billing, access and power
With networked chargers the property decides who can charge and what it costs: residents only, a per-kWh or per-session price, free charging as an amenity, or the chargers opened to the public. The network collects payment and reports usage, so the property does not meter each resident. Load management spreads the available power across the chargers, which often avoids a utility service upgrade; when it does not, we coordinate the upgrade with the utility.
What the project involves
A typical multifamily install follows the same path as any commercial charging job, handled by one team:
- Site assessment: parking layout, existing electrical capacity and where the chargers should go.
- Design and a fixed-scope quote, including hardware options and the incentives that may apply.
- Permitting and, where needed, utility coordination.
- Installation, inspection and commissioning, then activation on the charging network.
- Ongoing support. If the property already has old or unreliable chargers, we can remove and replace them and reuse the infrastructure where it makes sense.
An example with its own project page
- Modera Walsh Heights, Aledo: 18 Level 2 chargers, listed as a destination charger on tesla.com (available to the public 24/7), checked September 16, 2026
More of our Level 2 work, at apartments, hotels, offices, retail and dealerships, is on the projects page. For hotels, see what EV charging a hotel should install.
Common follow-up questions
Should an apartment community install Level 2 chargers or fast chargers?
Level 2, in almost every case. Residents park for the night, so a 7 to 19 kW charger fills the car by morning, and the hardware and electrical work cost far less than DC fast charging. A Tesla Supercharger only fits a property that also sits on a busy road and wants to sell charging to drivers passing through.
How many EV chargers does an apartment complex need?
It depends on how many residents drive EVs today and how fast that is growing. The 20 apartment and multifamily sites we have finished in Texas have 2 to 44 chargers each, with 6 as the typical size. Starting with a smaller bank and running conduit and capacity for more is usually cheaper than building out every space on day one.
Can residents be billed for the electricity they use?
Yes. Networked chargers let the property set a price per kWh or per session, limit access to residents, or open the chargers to the public. The charging network collects the payment, so the property does not have to meter or bill each resident.
Will we need a bigger electrical service?
Not always. Load management shares the available power across the chargers, which often lets a property add stalls without a service upgrade. We check the existing capacity on the site assessment and tell you which route fits.
Which charger brands do you install at apartments?
Tesla Wall Connector, ChargePoint, EV Connect and Xeal. We are an authorized reseller for ChargePoint and EV Connect and a certified installer for Tesla and Xeal, so we can supply the hardware or install equipment you already have.
Next step
Tell us about the property on the contact page or call (512) 942-2448. The site assessment is free, and we will recommend how many chargers to start with, where they should go, and a budget range.
More guides
- How do you host a Tesla Supercharger on your property in Texas?
- What does a property need to host a Tesla Supercharger?
- How much can a Tesla Supercharger site earn a property owner?
- What EV charging should a hotel install?
- What EV charging should a gas station or travel center install?
- Who installs commercial EV chargers and Tesla Superchargers in Dallas-Fort Worth?
- Who installs commercial EV chargers and Tesla Superchargers in Austin?
- Who installs commercial EV chargers in Houston?
- Who installs commercial EV chargers in San Antonio?
- Who builds Tesla Superchargers and commercial EV charging in El Paso?
- What EV charging should a shopping center install?
- What EV charging should an office building install?
- Should a business install Level 2 chargers or DC fast chargers?
- What should you look for when hiring a commercial EV charging contractor in Texas?
Ready to see what your property could earn?
Start with a free, no-obligation site assessment. If your site looks promising, we prepare a custom ROI report and walk you through it on a call.