Guides

Who installs commercial EV chargers and Tesla Superchargers in Dallas-Fort Worth?

Bullet EV Charging Solutions is a Tesla-certified Supercharger installer that builds commercial EV charging and Tesla Superchargers across Dallas-Fort Worth. We have finished 29 charging sites in 16 DFW cities, 4 of them Tesla Supercharger sites and 25 Level 2 sites, at apartment, retail, hotel, fuel stop and healthcare properties.

Last updated November 18, 2026 · Bullet EV Charging Solutions, Austin, Texas

Our headquarters is in Austin, and we build across Texas. In Dallas-Fort Worth we have 37 sites built or under construction, 8 of them still being built. This guide sets out that record, what a Supercharger site and a Level 2 project each involve, and how a project starts.

Our record in Dallas-Fort Worth

  • 4 finished Tesla Supercharger sites with 70 posts between them, from 8 to 34 posts per site.
  • 25 finished Level 2 sites with 280 chargers, the largest with 52.
  • 9 finished in Dallas and 3 in Fort Worth, with the rest across 14 other cities in the metro.
  • 8 more sites under construction. Sites that are not public yet are counted here but never named.

The finished sites, by the type of property:

  • Apartment and multifamily communities: 9 Level 2 sites
  • Retail properties: 3 Supercharger sites
  • Hotels: 3 Level 2 sites
  • Fuel stops and travel centers: 1 Supercharger site
  • Healthcare facilities: 1 Level 2 site
  • Other commercial properties: 12 Level 2 sites

Dallas-Fort Worth projects with their own page

Largest first. Each one links to its project page.

The rest of our Texas work is on the projects page.

What a Supercharger site needs

A Tesla Supercharger delivers 50 to 500 kW per post and gets a car to 80% in 20 minutes to an hour, so it suits places where drivers stop briefly: highway corridors, fuel and travel centers, grocery, quick-service restaurants and short-dwell retail. Before we scope one, we check:

  • Parking you can dedicate to charging. Tesla sites are typically built in groups of at least 4 posts; our finished Supercharger sites in Dallas-Fort Worth have from 8 to 34 posts per site.
  • Power, or a path to it: existing utility capacity, or a realistic path to a new service. We run the utility application, which is usually the longest step in the schedule.
  • Visibility and access: on or near a major corridor, visible from the road, with simple in-and-out.
  • Open 24/7, with no barriers, gates, time limits or seasonal closures.
  • Restrooms, food or drink within a minute’s walk, reliably open through charging hours.
  • Every stall and pathway well lit, and the lot kept in good repair.

You provide the location and own the charging equipment. Tesla lists the site in every Tesla’s navigation, handles the driver experience, payments and network operations for a per-kWh services fee, and you set the price drivers pay. We design, permit and build the site and get it activated on the Tesla network. The full checklist is in what a property needs to host a Supercharger, and the steps from first call to first charge are in how to host a Tesla Supercharger in Texas.

What a Level 2 project at an office, apartment or retail site involves

Level 2 (AC) delivers 7 to 19 kW per port and takes hours to charge a car, so it fits where cars stay parked:

  • Offices: workplace charging that helps recruit, retain and hit sustainability targets.
  • Apartments: residents park overnight, so a 7 to 19 kW charger fills the car by morning. See what EV charging an apartment community should install.
  • Retail and mixed-use: destination Level 2 where dwell time is long, or a Tesla Supercharger where it is short.

Load management shares the available power across the chargers, which often lets a property add stalls without a new service. With networked chargers you decide who can charge and what it costs. We install Tesla Wall Connector, ChargePoint, EV Connect and Xeal, and can supply the hardware or install equipment you already have.

A typical Level 2 job, handled by one team:

  1. Site assessment: parking layout, existing electrical capacity and where the chargers should go.
  2. Design and a fixed-scope quote, including hardware options.
  3. Permitting and, where needed, utility coordination.
  4. Installation, inspection and commissioning, then activation on the charging network.
  5. Ongoing support, including replacing old or unreliable chargers and reusing the infrastructure where it makes sense.

The commercial Level 2 page compares Level 2 and a Supercharger side by side.

Common follow-up questions

Who are the best commercial EV charging installers in Dallas?

We will not rank installers, ourselves included, but we can show our record, and you should ask any installer you consider for the same. Bullet EV Charging Solutions is a Tesla-certified Supercharger installer and has finished 29 commercial charging sites across Dallas-Fort Worth, 9 of them in Dallas itself. The ones with a public project page are listed above.

I want Tesla Superchargers at my property in Dallas-Fort Worth. Which company should I call?

A Tesla-certified Supercharger installer, which is what we are. Bullet EV Charging Solutions has finished 4 Supercharger sites in Dallas-Fort Worth with 70 posts between them. Call (512) 942-2448 or use the contact page. The site assessment is free: we review traffic, parking and power and send a first ROI estimate.

Can you take on a large commercial EV charging project in Fort Worth?

Yes. We have finished 3 sites in Fort Worth itself, and our largest finished Supercharger site in the metro has 34 posts, while our largest finished Level 2 site has 52 chargers. Design, permitting, utility coordination, construction, commissioning and activation are handled by one team, with one contract and one point of contact.

Should my property get Level 2 chargers or a Supercharger?

It depends on how long cars stay parked. Where drivers stop for 20 minutes to an hour, such as a retail center or fuel stop on a busy road, a Supercharger fits. Where cars stay for hours, such as an office, apartment community or hotel, Level 2 fits better and the hardware and electrical work cost far less. Some properties do both, and we will say which fits on the site assessment.

How long does a project take?

Site qualification and an ROI report take days. From signed agreement to an active site, most projects take several months, with utility service upgrades and permitting being the long poles. We manage both.

Next step

Tell us about the property on the contact page or call (512) 942-2448. The site assessment is free, and we will tell you whether a Supercharger, Level 2 or a mix fits, how many chargers the site can take and what the power looks like.

More guides

All guides

Ready to see what your property could earn?

Start with a free, no-obligation site assessment. If your site looks promising, we prepare a custom ROI report and walk you through it on a call.